RIVERSIDE QUAY
Supply, fabrication, shop detailing, surface treatment, delivery, and erection of steelwork and purlins/girts;
- East elevation on section 7 and addendum 24
- Canopy at south east corner on level 4
- Canopy at west evelvation on level 1
- Roof at north east corner and small roof at north west on level 3
- Steel column supporting stair landing
- Level 9A steel walkway
- Ground floor and level 2 steel. (excluding all above mentioned steel)
- Sections 34 & 35 steel struts
- Metalwork on architectural
- Alimak & crane access platforms (level 7 & 9)
- Temporary design for a roof over the east plaza gantry stairs
- Level 21 roof, plant platform and architectural claws
- Dismantle and removal of temporary structural steel
- Project management
Category:
Commercial
Client:
Mirvac Constructions
Tonnage:
500
Year:
2016