888 Collins Street

888 Collins Street

888 COLLINS STREET

Supply, Fabrication, Surface Treatment, Delivery and Erection of Structural Steelwork;

Including:

  • Prefabricated Link Bridges between adjacent towers
  • Plant Room structures and screens     

Category:

Residential

Client:

Lend Lease

Tonnage:

500

Year:

2016

Melbourne Rectangular Stadium

Melbourne Rectangular Stadium

MELBOURNE RECTANGULAR STADIUM

GVP fabricated, painted and delivered 40% of the Roof Shell steelwork for Melbourne’s iconic AAMI Park Stadium.

The Roof Shells were delivered in frames that were up to 8.6 metre wide and 42 metres long.

GVP managed the over dimensional delivery process with the relevant State and Local Government authorities.

Category:

Sports & Entertainment

Client:

Grocon Constructions

Tonnage:

700

Year:

2011

699 Bourke Street

699 Bourke Street

699 BOURKE STREET

699 Bourke Street project was a 8 story composite slab office tower constructed above Southern Cross Railway Station. GVP’s scope included construction of the lift over run framing, main structural crash barriers, north entry pavilion, 8 levels of structural floor framing including bondeck and shear studs, level 4 carpark and the south entry pavilion.

Category:

Commercial

Client:

Mirvac Constructions

Tonnage:

3,000

Year:

2014

Eastern Plaza at Melbourne Park

Eastern Plaza at Melbourne Park

EASTERN PLAZA AT MELBOURNE PARK

Eastern Plaza was the first stage in the Melbourne Park Tennis Centre redevelopment. GVP’s scope consisted of construction of the main stadium housing 8 internal courts, all external feature façade mullions, external elevated walkways linking the area to the MCG link bridge and the main carpark bellow the main structure together with the pedestrian link bridge over Olympic Boulevard.

Category:

Sports & Entertainment

Client:

Watpac

Tonnage:

1,150

Year:

2012

Eastlink Bridges

Eastlink Bridges

EASTLINK BRIDGES

GVP was contracted to supply 5 large steel bridges for the EastLink project. Two of the bridges being Princes Highway and Cheltenham Road were completed two months ahead of schedule. The bridges for Heatherton Road and Ringwood Railway Bridge were completed on program.

Category:

Infrastructure

Client:

Thiess / John Holland Joint Venture

Tonnage:

2,200

Year:

2006

Southern Cross Redevelopment

Southern Cross Redevelopment

SOUTHERN CROSS REDEVELOPMENT

This is a forty level steel structure consisting of approximately 6,000 tonnes of structural steel. GVP completed fabrication of this over a 16-month period. GVP also supplied and installed the condek and sheer studs on this project. 

Category:

Commercial

Client:

Multiplex

Tonnage:

6,000

Year:

2005

Margaret Court

Margaret Court

MARGARET COURT

Margret Court Expansion was stage 2 in the Melbourne Park Tennis Centre redevelopment. GVP’s scope consisted of construction of the main stadium including the main roof support truss system, retractable roof structure, main roof structure, feature façade mullions and secondary steel support structure.

Category:

Sports & Entertainment

Client:

Lend Lease

Tonnage:

2,000

Year:

2014