AUSTRALIAN CATHOLIC UNIVERSITY, MELBOURNE CAMPUS
Highly architectural and complex structure, adjacent and on top of existing (live) University buildings.
Scope included:
Four Storey Steel Structure, built over the top of existing six storey heritage building requiring complex temporary works and jacking systems.
Main building was a thirteen storey steel composite structure.
Category:
Education
Client:
Besix Watpac
Tonnage:
2240
Year:
2022